
At first Abed Textile
Processing Mills Limited receive the gray from the concern party. Then it
goes to desize (generally in zambo machine) with assurance of checking and
quality control department. In desizing section removes chemicals which are use
in sizing of gray. Completing the process, the gray dry in stenter machine.
Next, the product goes to scour and bleach. The total ending step of scouring,
bleaching and washing gets twelve hours.
If party required for dyeing
the fabrics, it send to dyeing section. After dyeing the fabrics makes dry with
stenter machine. Stenter machine make the right weight of the product (as per
prescribed measurement of concern party) and develop the quality of the product.
And then it goes to be printed.
Printed fabrics transferred to
lob steam machine. Here the gray gets color everlasting and keep the best
quality permanently. Completing the process the product put in super wash
machine. Super wash machine methodically clean the fabrics as well as remove
unexpected spot and other dusts.
To finish and to make the
printed fabrics strong, moisture, neat and legible and to keep standard
measurement of the product, it runs through stenter machine. Stenter machine
fixed up color everlasting, make the right weight of the product (as per
prescribed measurement of concern party) and develop the quality of the product.
Then it sends to felt calendar machine and folds it by folding machine in a
particular direction. The last process of the product before going to the market
it decorates with label and packet.
Now it is ready to deliver to the
party. |